We Offer:
A. Inter-Island Submarine Cable Connections
B. Overhead transmission Lines Connection
Inter-Island Submarine Cable Connections
- Single Phase Submarine cable, up to 17.5kV
- Three Phase Submarine cable, up to 17.5kV

Occidental Mindoro Electric Cooperative, Inc. (OMECO)
13.2kV, 3Ph, Submarine Cable, 2kms
-From Sta. Theresa Magsaysay to Ilin Island San Jose and Ilin Island
-From Ilin Island to Ambulong island
Date Completed: June 7, 2016

Eastern Samar Electric Cooperative Inc.
(ESAMELCO)
13.2kV, 1Ph, 6kms Submarine Cable
From Tubabao Island to Manicani Island
Date Completed: May 30, 2014

Aklan Electric Cooperative Inc. (AKELCO)
13.2kV, 3Ph, 1.2kms Submarine Cable
From Tabon Caticlan to Manoc Manoc Boracay Island
Date Completed: July 17, 2005

Marinduque Electric Cooperative, Inc.
(MARELCO)
Construction of 2.2kms. 3-Phase Submarine Cable to connect islands of Brgy. Polo and Brgy. Maniwaya, Sta. Cruz
Date Completed: February 16, 2019

Romblon Electric Cooperative, Inc.
(ROMELCO)
Survey, Preparation of Detailed Engineering Design, Supply of Materials / Equipment, Installation / Construction of Submarine Cable from Romblon Island to Logbon & Alad 3kM
Date Completed: May 15,2016

Anflo Management and Investment Corporation (ANFLOCOR)
13.2kV 3Ph w/ fiber optic Submarine Cable, 1km from take-off at Pearl Farm to Malipano Island
Date Completed: January 19, 2018

Davao Del Norte Electric Cooperative
(DANECO)
Testing, repair commissioning and energization of Samal Submarine Cable. Approx. 300m Cable Replacement
Completed
Overhead Transmission Lines Connections
- Single Circuit Transmission Lines, up to 230KV
- Double Circuit Transmission Lines, up to 230KV

Carmen Copp
Double Circuit Transmission Line
34.5 kV System
Date Completed: May 2, 2014

Central Pangasinan Electric Cooperative Inc.
Transmission Line
69 kV System
Status: On-going

D.M. Consunji (DMCI)
Transmission Line
230 kV System
Date completed: June 2014

CASURECO III
Construction of 11kM 69kV Transmission Line From San Francisco to Inapatan, Nabua, Camrines Sur
Date Completed: 09 August 2021

Panay Electric Development Corporation
Design, Installation and Integration of PEDC 138kV Line 1 and Line 2 Permanent Connection to NGCP Southern Panay Backbone Project
Status: On-going
Projected Date of Completion: 17 December 2021