Substation Rentals

Complete design and installation of Power Substation for Utilities with a Capacity of ≥5MVA ≤25MVA, ≤69kV, 3Ph, 60Hz.  Affordable, reliable, compact, tailored to your needs.

Central Pangasinan Electric Cooperative (CENPELCO)
4×20/25MVA, 69kV – 13.2kV, 3Ph, 60Hz
1×10/12.5MVA, 69kV – 13.2kV, 3Ph, 60Hz
1-15kM and 1-5kM, 69kV Transmission Line
Status:  Active

Sorsogon 2 Electric Cooperative (SORECO 2)
2MVA, 69kV – 13.8kV, 3Ph, 60Hz
Status: Active

Ilocos Norte Electric Cooperative (INEC)
10MVA, 69kV – 13.2kV, 3Ph, 60Hz
Status: Handed-over

Isabela II Electric Cooperative (ISELCO II)
5MVA, 69kV – 13.2kV, 3Ph, 60Hz
Status: Handed-over

Top