Transmission Lines

We Offer:

A.  Inter-Island Submarine Cable Connections
B. Overhead transmission Lines Connection

Inter-Island Submarine Cable Connections

  1. Single Phase Submarine cable, up to 17.5kV
  2. Three Phase Submarine cable, up to 17.5kV

Occidental Mindoro Electric Cooperative, Inc. (OMECO)
13.2kV, 3Ph, Submarine Cable, 2kms
-From Sta. Theresa Magsaysay to Ilin Island San Jose and Ilin Island
-From Ilin Island to Ambulong island
Date Completed:  June 7, 2016

Eastern Samar Electric Cooperative Inc.
(ESAMELCO)
13.2kV, 1Ph, 6kms Submarine Cable
From Tubabao Island to Manicani Island
Date Completed:  May 30, 2014

Aklan Electric Cooperative Inc. (AKELCO)
13.2kV, 3Ph, 1.2kms Submarine Cable
From Tabon Caticlan to Manoc Manoc Boracay Island
Date Completed:  July 17, 2005

Marinduque Electric Cooperative, Inc.
(MARELCO)
Construction of 2.2kms. 3-Phase Submarine Cable to connect islands of Brgy. Polo and Brgy. Maniwaya, Sta. Cruz
Date Completed:  February 16, 2019

Romblon Electric Cooperative, Inc.
(ROMELCO)
Survey, Preparation of Detailed Engineering Design, Supply of Materials / Equipment, Installation / Construction of Submarine Cable from Romblon Island to Logbon & Alad 3kM
Date Completed:  May 15,2016

Anflo Management and Investment Corporation (ANFLOCOR)
13.2kV 3Ph w/ fiber optic Submarine Cable, 1km from take-off at Pearl Farm to Malipano Island
Date Completed:  January 19, 2018

Davao Del Norte Electric Cooperative
(DANECO)
Testing, repair commissioning and energization of Samal Submarine Cable. Approx. 300m Cable Replacement
Completed

Overhead Transmission Lines Connections

  1.   Single Circuit Transmission Lines, up to 230KV
  2.   Double Circuit Transmission Lines, up to 230KV

Carmen Copp
Double Circuit Transmission Line
34.5 kV System
Date Completed:  May 2, 2014

Central Pangasinan Electric Cooperative Inc.
Transmission Line
69 kV System
Status:  On-going

D.M. Consunji (DMCI)
Transmission Line
230 kV System
Date completed: June 2014

CASURECO III
Construction of 11kM 69kV Transmission Line From San Francisco to Inapatan, Nabua, Camrines Sur
Date Completed: 09 August 2021

Panay Electric Development Corporation
Design, Installation and Integration of PEDC 138kV Line 1 and Line 2 Permanent Connection to NGCP Southern Panay Backbone Project
Status:  On-going
Projected Date of Completion: 17 December 2021